Kennedy Go Station Platform Extension

Project Info
  • Construction Date: November 19, 2012
  • Location: 2467 Eglinton Ave E, Scarborough, ON M1K 2R1
  • Values: $564,335.46
  • Category: Completed, Emergency Works
  • Client : Metrolinx
Project Details

Scope of this project includes Site Work, Demolition and Removal, Geotextiles, Erosion Control Works, Site Grading Excavation, Trenching and Backfilling Clearing and Grubbing Crushed Rock Ballast Dust Control Asphalt Paving Granular Courses Pavement Markings. Sewers and Appurtenances Aggregates: General. Subdrain Installation Sound Wall Sign Post and Sign Installation Sodding Topsoil & Finish Grading Landscaping Concrete […]

More Project Details

Scope of this project includes

  • Site Work, Demolition and Removal, Geotextiles, Erosion Control Works, Site Grading
  • Excavation, Trenching and Backfilling
  • Clearing and Grubbing
  • Crushed Rock Ballast
  • Dust Control
  • Asphalt Paving
  • Granular Courses
  • Pavement Markings.
  • Sewers and Appurtenances
  • Aggregates: General.
  • Subdrain Installation
  • Sound Wall
  • Sign Post and Sign Installation
  • Sodding
  • Topsoil & Finish Grading
  • Landscaping
  • Concrete Formwork
  • Cast-in-Place Concrete.
  • Risistone Segmental Retaining Wall
  • Unit Masonry
  • Precast Concrete Platform Curbs.
  • Sealants
  • Signage
  • Signage Details.
  • Public Address System
  • CCTV Systems
  • Prefabricated Platform Shelters.
  • Electrical – General Provisions
  • Electrical – General Requirements
  • Basic Materials and Methods
  • Direct Buried Underground Cable Ducts
  • Wire and Cable (0-1000V)
  • Installation of Conduits, Conduit Fastenings and Conduit Fittings, Grounding, Lighting Equipment Outdoors, Communications Conduit System.